Worldwide Sport Supply, Vestal, NY:

When the racking system was set up at World Wide Sport Supply, the existing 400W Metal Halide fixture layout was set up for an open warehouse space. Because of this, the lighting in the isles between the racking was inefficient, and it was difficult for the picking staff to effectively see items on the shelving. To alleviate this, Eastern Energy Solutions redesigned the layout with 4 Lamp T-8 Fluorescent High Bay fixtures to work with their current layout. The result was an efficient and effective lighting system that gave the increased light levels needed to work in the isles. At the same time we were able to reduce the energy consumption in that area by 51%!

Before                                                       After

 
 
 


American Pipe & Plastics, Binghamton, NY:


As part of a facility-wide lighting retrofit, this pipe storage area received 6 lamp T-8 High Bay Fluorescent fixtures in replacement of the existing 400 Watt High Bay Metal Halide fixtures. The result was an increase of 20%-30% in foot-candles, increased CRI and 51% in power savings.

Before                                                After

 
 


Beaver Mountain Log & Cedar Homes, Deposit, NY:


As part of the lighting retrofit of the manufacturing plant at Beaver Mountain Log & Cedar Homes, this sawmill area was retrofitted from high bay 400W Metal Halide fixtures to 6 lamp T-8 High Bay Fluorescent fixtures. The effects here were a dramatic increase in foot candles and CRI, along with 51% in power savings.

Before                                                After

 
 
 


Best Western, Johnson City, NY:

The outdoor building façade lighting at the Best Western was too dark and uninviting. To accompany their complete renovation of the outside of the hotel we designed a lighting system that would show off their new crown molding and make it one of the nicest looking hotels in that area. It really stands out from the highway!

Before                                                After

 
 


Court Jester East, Binghamton, NY:

As part of the design of this new premier exercise and spa facility, the spinning area came out as beautiful as planned. Here are some photos during construction and the final product.

Before                                                After

 
 


Cleaner Supply, Conklin, NY:


As part of a complete relighting of the Cleaner Supply manufacturing and warehouse areas, these aged 1000 Watt High Bay metal halide fixtures in the isle racking areas were replaced by 6 lamp High Bay T-5 Fluorescent Fixtures. The result was much better lighting for the pickers in these isles. Foot candles and CRI were increased, along with a 68% savings in power.

Before                                                  After

 

 


Davis College, Binghamton, NY:


The gymnasium at Davis College was one of the most favorite areas of the students and faculty after completion of the campus wide lighting retrofit. With a 40% increase in foot candles you could even notice the difference in photos taken of the basketball team before and after the retrofit. Plus, by adding motion sensors to some of the fixtures, we were able to increase savings even more by being able to keep the majority of the fixtures off when not in use. Before the 400W Metal Halide fixtures needed to be left on the entire day because of long re-strike periods. The existing 400W Metal Halide high bays were retrofitted with the 6 Lamp T-8 Fluorescent High Bay fixtures with a polycarbonate lens and wire cage. Including the motion sensors, the total power savings was an amazing 74%!

Before                                                After

 
 


Hamilton Central School, Hamilton, NY:


The one for one retrofit of the 400W Metal Halide high bay fixtures to 6 Lamp T-8 Fluorescent High Bays with a polycarbonate lens and wire cage in the main gymnasium at Hamilton Central School gave the extra lumens that they were looking for. With a 15% increase in foot candles and a dramatic increase in CRI, there was still a 51% power savings over the existing fixtures.

Before                                                After

 
 


Matthews Chrysler, Vestal, NY:

The lighting replacement in the service area of Matthews Chrysler consisted of retrofitting the Low Bay 400W Metal Halide fixtures with high power 6 Lamp Fluorescent fixtures and retrofitting the work bench fixture with high power and reflectance T-8 strip fixtures. The result was much better lighting for the mechanics to work in. They achieved a 51% savings in energy consumption, whiter light and increased foot candles and color rendering index.

Before                                                After

 
 


Chenango Ice Rink, Chenango Bridge, NY:

This dramatic lighting change at the Chenango Ice Rink took place when we replaced the antiquated recessed 400W High Bay Metal Halide fixtures with 6 Lamp High Bay Fluorescent fixtures with a polycarbonate lens and a wire cage. The new fixtures give a much more complete light spread and there are now no dark spots on the ice rink. Again here there was a moderate increase in foot candles, a big increase in CRI and a 51% savings in energy consumption.
 

Before                                                After

 
 


Rocco J. Testani, Binghamton, NY:


In this distribution warehouse area at Rocco J. Testani, the 250W High Pressure Sodium high bays were replaced one for one with 4 Lamp T-8 Fluorescent High Bays with a polycarbonate lens. The increase in foot candles and color rendering index made for a tremendous improvement for the staff working in that area. There was a 47% savings in energy consumption here.

Before                                                After